Purpose: Install water supply, tanks and drainage that feed irrigation, pools and site facilities.
Key responsibilities
- Make water connections from municipal or TSE supply to tanks, pumps and irrigation.
- Install GRP/PE tanks, float valves, PPR/uPVC/GI pipework and fittings.
- Install drainage, cleanouts and pool overflow/backwash lines.
- Pressure-test and leak-check all work; repair faults.
Requirements: Trade certificate; 3+ years in UAE; PPR and uPVC jointing; can read plumbing drawings.
Trade test: Install a tank connection with float valve and pass a pressure test.